14/09/2026
Thought I’d do an update on the studio as we go into a new week. The roof was VERY wavy and had seriously sagged, particularly in the area where we want to replace the rotten window with French doors, causing a major height issue. After a lot of brain ache, John came up with a brilliant plan and has managed to straighten it and raise the sagging area by a few inches, at the same time strengthening the existing timbers. Not an easy task, without stressing the surrounding fixed areas but it has worked. 🙌 😮💨
The aim now is to have the new frame made by the end of this week, so we can get some doors on order🤞