🩷Delta Gamma House Project #2:
Once the plans for the bathroom in the expansion wing were underway, the sorority reached back out to me asking for help in a renovation project that came up very last minute.
Student housing renovation projects typically begin planning in Dec/Jan before the summer when they happen, but they came to me at the end of March for this one. Quite a bit behind schedule making this one more like pulling a rabbit out of a hat.
I came up with a plan within their budget that would give the 10 dorm room bathrooms (14 showers) a serious upgrade/refresh/transformation from what they had currently that could also be accomplished in the short summer time frame.
I assisted the client in reviewing 3 general contractors and selecting one that best fit their needs. I then facilitated the commencement of construction on behalf of the client and worked with the general contractor as the project manager liaison to ensure the best interest of the client was always at the top of the priority list.
🛳️Scope of work:
⚓️Replace current prefab shower surrounds with a more modern solid surface shower solution.
⚓️New tile floors correction slope of floors to drain
⚓️Proper waterproofing for a commercial dormitory application
⚓️Reface and refinish cabinets. Add new cabinet over the toilet.
⚓️New counter tops, sinks, and all new plumbing.
⚓️Yearly facility maintenance task of snaking all drains.
⚓️New mirrors.
⚓️Replace recessed fluorescent lighting with LED lighting
⚓️New bath, cabinet, and shower rod hardware
⚓️Drywall patch and repair
⚓️New paint
⚓️Thorough clean and protection of the whole house during and after construction.
I will share some before & after photos in stories later today. The girls moving in the house this weekend are truly in for a treat!
I can’t thank Create Construction LLC enough for the great job they did on this one too!