Bathroom remodel in process. New tub, shower wall tiles, floor tiles, vanity, fan, and toilet. Really loving the 2/3rd o...
04/03/2026

Bathroom remodel in process.
New tub, shower wall tiles, floor tiles, vanity, fan, and toilet. Really loving the 2/3rd offset for the wall tiles.

The lights are old and still need to be removed.

Kitchen is 99% complete! Really loving the brushed gold finishes.Unfortunately the pot filler got placed a little too hi...
03/10/2026

Kitchen is 99% complete!
Really loving the brushed gold finishes.

Unfortunately the pot filler got placed a little too high and needs to be adjusted.

Slowly but surely the kitchen is coming along. Flooring, recessed lighting are in. Cabinets are installed. Fridge, stove...
02/22/2026

Slowly but surely the kitchen is coming along.
Flooring, recessed lighting are in.
Cabinets are installed.
Fridge, stove, and dishwasher installed.
🔥

For the kitchen floor, the plywood and wonder board are in and almost ready for the porcelain tiles. Kitchen cabinetry i...
02/04/2026

For the kitchen floor, the plywood and wonder board are in and almost ready for the porcelain tiles. Kitchen cabinetry is being assembled. These are the white oak shaker cabinets from Home Depot.

01/27/2026

Here is another video showing the hardwood floor refinish and 4.5” flat baseboard installation in the hallway and two of the bedrooms.

The final coat of the hardwood floor is in. Looks and feels super smooth. We went with a matte finish so that it isn’t t...
01/27/2026

The final coat of the hardwood floor is in. Looks and feels super smooth. We went with a matte finish so that it isn’t too shiny.

Primed baseboard is also installed but it still needs to be painted. Ended up using only about 260 of the 400 linear foot we purchased.

Kitchen demo’ed before and after.
01/26/2026

Kitchen demo’ed before and after.

01/23/2026

Update 1/23/2026:

The foundation work after almost 3 weeks is almost complete. Now we’re just keeping an eye out for minor sagging and will level more if needed.

Hardwood floor refinishing is a work in progress. Today the sanding of the three bedrooms and hallway are done. We are a little low on meat in the living room as it’s been sanded before so just doing a buff there.

The darker brown hardwood floor is from before.

Starting another Napa renovation project this new year!In addition to the planned kitchen and bathroom renovations, we u...
01/03/2026

Starting another Napa renovation project this new year!

In addition to the planned kitchen and bathroom renovations, we uncovered some foundation issues that need to be addressed.

In the crawlspace, we observed multiple pier-and-post supports with improper bearing — including posts not fully contacting their concrete piers, gaps that had been shimmed, and some posts that were not adequately supporting the main girders.

It has also been a rainy season, so much of the crawlspace has been occupied with water so our first step before doing anything is to install a sump pump!

Our final inspection passed two weeks ago! Super thankful to God for this entire process being smooth. Even though this ...
09/11/2022

Our final inspection passed two weeks ago!

Super thankful to God for this entire process being smooth. Even though this project ended up taking almost a full year as opposed to the estimated 6 months I have no complaints because it is just such an amazing outcome!

The kitchen turned out much larger than expected!
08/05/2022

The kitchen turned out much larger than expected!

Kitchen looking super fresh! Countertop and appliances coming soon 🔜
07/16/2022

Kitchen looking super fresh! Countertop and appliances coming soon 🔜