10/16/2026
5 things we’d plan before the walls close up 👇
As a contractor & interior designer we know how much harder these details are to change once the walls are finished.
1. Support for what you’ll hang
Floating shelves, TVs, towel bars and future grab bars may need blocking: solid backing inside the wall for secure mounting. Confirm locations, heights and product requirements before drywall. Think about what you might need in the future, too.
2. What’s sharing your pocket door wall
The door needs somewhere to go when it slides open. Plumbing, electrical boxes and mounting screws can conflict with that space. Plan switches, shelving and towel bars on both sides around the door system.
3. A plan for laundry leaks
Especially above finished living space. Discuss accessible shutoffs, leak sensors and automatic water shutoffs with your plumber. A floor drain needs proper plumbing and floor detailing. It doesn’t make the room waterproof on its own. Plan this before plumbing rough in.
4. Electrical locations that fit your routines
Where will your vacuum charge? Will bedside outlets be hidden behind the headboard? Can you reach switches when doors are open? Walk through furniture, cabinetry and daily habits with your electrician before rough in.
5. Actual appliance specifications
“Standard size” isn’t enough. Confirm models before finalizing cabinetry and service locations. Check door swings, ventilation, power, water and drainage requirements. A fridge can fit its opening but still lack clearance to open fully or remove drawers.
One extra tip: photograph open walls with measurements before they’re covered. Keep these with your renovation records, but always verify service locations before drilling.
Save this for your renovation and follow us at Watson Construction & Design. We’ll explain each topic in our Plan Before You Renovate series.