29/08/2026
This photograph shows the interior of a ferry during a major refurbishment. The new service counter structure is already taking shape, with light wood wall panels and vertical decorative slats installed, while electrical systems, lighting and ceiling elements are still being fitted. Tools, cables and construction materials remain throughout the space as the work progresses.
The image captures the transformation of the ship’s interior at an intermediate stage, before the finishing work is completed. It provides a behind-the-scenes view of the installation process, showing how the finished passenger areas are assembled from structural elements, interior panels, lighting and technical systems.