Lasercroft Flooring

Call Directions Website

Lasercroft Flooring Lasercroft Flooring are a specialist applicator of protective coatings primarily in the food, chemical and engineering industries.

THE GREENEST FLOOR IS THE ONE YOU DON'T REPLACE ♻️ Replacing a failed industrial floor means breaking out and disposing ...
22/10/2026

THE GREENEST FLOOR IS THE ONE YOU DON'T REPLACE ♻️

Replacing a failed industrial floor means breaking out and disposing of the old system, remediating the underlying concrete, manufacturing and transporting a new system.

Do that every five years instead of every twenty-five, and you have quadrupled the impact of the same square metre.

A system properly matched to its environment lasts decades. One chosen because it was cheap, quick, or the only thing available that week does not.

So if sustainability is landing on your desk as a reporting requirement, longevity is a legitimate part of the answer, and one of the few ways to save money at the same time.

Happy to talk it through. 01482 229119

𝗦𝗲𝗰𝘁𝗼𝗿 𝘀𝗽𝗼𝘁𝗹𝗶𝗴𝗵𝘁: 𝗰𝗼𝗹𝗱 𝘀𝘁𝗼𝗿𝗲𝘀 𝗮𝗻𝗱 𝗰𝗵𝗶𝗹𝗹𝗲𝗱 𝗱𝗶𝘀𝘁𝗿𝗶𝗯𝘂𝘁𝗶𝗼𝗻.Cold store floors fail in ways that catch people out because the ...
19/10/2026

𝗦𝗲𝗰𝘁𝗼𝗿 𝘀𝗽𝗼𝘁𝗹𝗶𝗴𝗵𝘁: 𝗰𝗼𝗹𝗱 𝘀𝘁𝗼𝗿𝗲𝘀 𝗮𝗻𝗱 𝗰𝗵𝗶𝗹𝗹𝗲𝗱 𝗱𝗶𝘀𝘁𝗿𝗶𝗯𝘂𝘁𝗶𝗼𝗻.

Cold store floors fail in ways that catch people out because the damage happens where nobody is looking.

Water seeps into the concrete surface. It freezes. It expands. It thaws. Repeat that cycle a few thousand times, and the surface breaks up from within. Not from traffic, not from impact, just from the environment doing what it does.

Add in the temperature swing at the dock doors, where a chilled space meets the outside air several hundred times a day, and you have a floor working harder than most people credit it with.

Resin changes this by sealing the concrete so water never gets in. But the specification has to account for the floor's temperature, and the installation has to account for the temperature at which it is laid; a cold substrate behaves very differently from a warm one.

It is a job that rewards someone who has done it before.

01482 229119 | [email protected]

CHRISTMAS SHUTDOWN: PHASING & AUDIT PRESSURENot every site can stop everything at once. For most working factories, that...
30/09/2026

CHRISTMAS SHUTDOWN: PHASING & AUDIT PRESSURE

Not every site can stop everything at once. For most working factories, that is simply the reality.

Which is why one weekend and done is not the only model. We have run flooring programmes across multiple weekends, taking a site section by section, so the operation never shuts down in full. Twelve weekends on one large processing site, laid to the right specification throughout, without the client ever losing a full week of production.

It takes more planning. More coordination on access, more thought about how sections meet, more conversations before anyone lifts a grinder. But it is usually the realistic option, and it beats squeezing six months of flooring into forty-eight hours.

It also suits anyone working to an audit deadline. Reactive work in a short window on a floor that needed a proper job six months ago is not ideal for anybody - you are working against the clock, the spec options narrow, and cure times do not move because there is pressure. A phased programme gives you a defensible plan instead.

If your floor is bigger than your shutdown window, that is a scheduling problem, not a reason to keep patching.

How we plan and phase shutdown work can be found in our latest blog post https://lasercroft.com/2026/09/03/factory-shutdown-flooring-how-to-make-every-hour-count/

Rob - 01482 229119 | lasercroft.com

SECTOR SPOTLIGHT: ENGINEERING AND METALWORKINGEngineering floors take a particular kind of punishment, and it is not the...
29/09/2026

SECTOR SPOTLIGHT: ENGINEERING AND METALWORKING

Engineering floors take a particular kind of punishment, and it is not the one people expect.

It is rarely a single dramatic event. It is cutting fluids and coolant finding every weakness in a surface. Swarf ground underfoot until it acts like sandpaper. Oil soaking into concrete over years until nothing will bond to it. Dropped tooling and components hitting the same spots repeatedly. Fork trucks turning tight on the same corner five hundred times a week.

Concrete has no answer to any of that. It dusts, it absorbs, it breaks down at the surface, and the contamination that soaks in makes the eventual repair harder than it needed to be.

The right system depends on the shop. Heavy-duty screeds where impact and point loading dominate. Coatings where chemical resistance and cleanability matter more. Sometimes different systems in different bays of the same building, which is entirely sensible and specified far less often than it should be.

Machine shop floor seen better days? Rob is on 01482 229119.

CHRISTMAS SHUTDOWN: WHEN SOMETHING GOES WRONGNobody likes this question, but it is the one worth asking any contractor b...
25/09/2026

CHRISTMAS SHUTDOWN: WHEN SOMETHING GOES WRONG

Nobody likes this question, but it is the one worth asking any contractor before you book a shutdown: what happens if something goes wrong halfway through?

A materials order does not arrive when it should. The substrate turns out worse than it looked. Something unexpected sits under the old screed.

We had a major materials order fail to turn up on a job. It was sorted within twenty-four hours through another supplier; the account was opened the same day, and the job stayed on programme.

The difference is what happens next. Whether someone has the relationships to solve it at short notice, whether they tell you straight away, and whether they carry on regardless and hope you do not notice until February.

We will tell you immediately, explain what it means for the timeline and the cost, and work out the way forward with you. We do not hide problems and push on.

Worth asking that question of whoever you book. Their answer tells you a lot.

You can find out how we plan and run shutdown work in our latest blog post: https://lasercroft.com/2026/09/03/factory-shutdown-flooring-how-to-make-every-hour-count/

01482 229119 | [email protected]

COLOUR AND LIGHTAn underrated thing about a new resin floor: the room gets brighter.A worn, stained, patched concrete fl...
23/09/2026

COLOUR AND LIGHT

An underrated thing about a new resin floor: the room gets brighter.

A worn, stained, patched concrete floor absorbs light. Replace it with a light-coloured seamless finish and the same lighting installation does noticeably more work. People comment on it before they comment on the floor.

Colour earns its place in other ways too. Zoning areas by finish gives people an instinctive sense of where they are and where they should not be. A lighter floor shows spillages and contamination sooner, which matters in food and hygiene-critical environments where you want to see a problem rather than walk it around the building. And in customer-facing or audit-facing spaces, a clean floor does a lot of quiet work before anyone has said a word.

It is rarely the reason someone replaces a floor. It is often the thing they mention afterwards.

01482 229119 | [email protected]

TEMPERATURE AND SEASONResin does not care what is in your diary. It cares what the temperature is.As we head into autumn...
22/09/2026

TEMPERATURE AND SEASON

Resin does not care what is in your diary. It cares what the temperature is.

As we head into autumn, this starts to matter. Resin systems cure chemically, and that reaction slows as they cool. Below certain temperatures, some products will not cure properly at all. Others cure so slowly that the twenty-four hours you planned for becomes forty-eight, and the shutdown window you booked no longer works.

It affects the substrate too. Cold concrete draws heat out of the system as it goes down. A slab that has been sitting at four degrees in an unheated warehouse behaves very differently to one in a heated production hall.

None of this makes winter installation impossible. It is done constantly. It just has to be planned for - temporary heating, adjusted product selection, realistic cure allowances built into the programme rather than discovered on site.

Which is the argument for surveying in September for a job in December. The conditions are part of the specification.

Talk to the team about your survey on 01482 229119

365 DAYS PER YEARAt two o'clock on a Friday afternoon, we are not thinking about calling it a day. That attitude is the ...
21/09/2026

365 DAYS PER YEAR

At two o'clock on a Friday afternoon, we are not thinking about calling it a day.

That attitude is the reason we can offer resin flooring services 24 hours a day, 365 days a year.

A floor goes on a Tuesday night, and the line cannot run in the morning. A section lifts on a Sunday, and there is an audit on the Thursday. Somebody spots damage during a bank holiday changeover, and there are three days to sort it before production restarts.

We work evenings. We work weekends. We work the days when everyone else is shut, because that is often the only time a floor can be touched at all.

For advice on planning your out of hours jobs, call Rob on 01482 229119

CHRISTMAS SHUTDOWN: HOW MUCH FITS IN A WEEKEND"How much floor can you actually lay over a weekend?"Fair question, and th...
18/09/2026

CHRISTMAS SHUTDOWN: HOW MUCH FITS IN A WEEKEND

"How much floor can you actually lay over a weekend?"

Fair question, and the honest answer is that it depends more on your substrate than on our gangs.

A straightforward polyurethane screed applied to sound, well-prepared concrete can cover several hundred square metres over a weekend. That is a real number, not a sales one.

What eats the time is everything else. Contaminated concrete that needs cutting out and making good. Multiple drains and upstands. Areas that need different systems. Old screed hiding damage nobody could see until it came up. Any of those, and the same weekend covers a fraction of the area.

Which is why we will not quote an area over the phone, and why we survey before we price. We would rather tell you in September that your floor is a two-phase job than tell you at four o'clock on the Sunday.

We will tell you what is realistic once we have seen it. We will not promise what we cannot deliver.

The full picture on shutdown work can be found in our latest blog post: https://lasercroft.com/2026/09/03/factory-shutdown-flooring-how-to-make-every-hour-count/

For advice, call Rob on 01482 229119.

WORKING AROUND LIVE PRODUCTIONWe recently laid a floor in a busy biosecure commercial factory. No hitches. Organised, pr...
17/09/2026

WORKING AROUND LIVE PRODUCTION

We recently laid a floor in a busy biosecure commercial factory. No hitches. Organised, protocols followed throughout, production carrying on around us.

That does not happen by accident. It happens because we went in knowing exactly what we were walking into rather than hoping for the best.

Working in a live facility is a different job to working in an empty one. Segregation and barriers. Dust control. Fume management and ventilation planning. Site inductions and hygiene protocols that our lads follow are the same as your staff do. Sequencing so nothing we are doing crosses anything you are producing.

Most of that has to be agreed before anyone arrives. It is why the pre-start conversation matters as much as the install.

If stopping the whole operation is not an option, that is usually workable. It just needs to be planned properly rather than improvised on the day.

For advice, call Rob on 01482 229119.

Address

9 Hedon Road
Kingston Upon Hull
HU91LH

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441482229119

Alerts

Be the first to know and let us send you an email when Lasercroft Flooring posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share