18/07/2026
Just a couple of jobs that I’ve recently done including lvt herringbone for the final room in the house along with a couple of rooms I done previously along with most of the house before I went downhill with my health and also a small job at the Hawthorns school and nursery just requiring a replacement safety flooring. Nothing special the latter but it was additional after fitting an event carpet as I usually do annually for them!
As for availability apart from 3 days in the middle of August with allocated time off in thought and still unable to do overtime, I am pretty much booked up until the middle of September and then a few days here and there booked.
It’s been a rather solid may and summer which has been much needed, still a long way to get to 100% but besides the odd infection to setback very very slowly improving by the week.