āĻāĻāĻāύ āϏāĻŋāĻāĻŋāϞ āĻāĻā§āĻāĻŋāύāĻŋāϝāĻŧāĻžāϰ-āĻāϰ āĻāύā§āϝ âThumb Rulesâ (āĻĨāĻžāĻŽ āϰā§āϞ) āĻāĻžāύāĻž āĻā§āĻŦāĻ āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖ āĻāĻžāϰāĻŖ āĻāĻā§āϞ⧠āĻĻāĻŋā§ā§ āĻĻā§āϰā§āϤ āĻšāĻŋāϏāĻžāĻŦ āĻŦāĻž āĻāύā§āĻŽāĻžāύāĻŋāĻ āĻĒāϰāĻŋāĻŽāĻžāĻŖ āĻŦā§āϰ āĻāϰāĻž āϝāĻžā§ || āĻŦāĻŋāĻļā§āώ āĻāϰ⧠Estimate, B.O.Q. āĻŦāĻž Site Work-āĻāϰ āϏāĻŽā§ ||
āύāĻŋāĻā§ āĻāĻŽāĻŋ āĻāĻĒāύāĻžāĻĻā§āϰ āĻāύā§āϝ āϏāĻŦ āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖ āĻŽā§āĻā§āϰāĻŋāϝāĻŧāĻžāϞāϏ āĻ
āύā§āϝāĻžāϝāĻŧā§ āĻĨāĻžāĻŽ āϰā§āϞ (Thumb Rules) āϏāĻŽā§āĻš āĻĻā§āĻāĻžāύ⧠āĻšāϞ⧠||
-----------------------------------------------------------------------
âĒī¸ āϏāĻāĻā§āώāĻŋāĻĒā§āϤ āϏāĻžāϰāĻžāĻāĻļ (āĻŽā§āĻāϏā§āĻĨ āĻāϰāĻžāϰ āĻŽāϤā§):
1 mÂŗ brickwork = 500 āĻāĻ
1 mÂŗ RCC = 8 bag cement + 0.4 mÂŗ sand + 0.8 mÂŗ stone
1 mÂŗ RCC-āϤ⧠= 100 kg steel (avg)
1 bag cement = 0.035 mÂŗ
12 mm plaster 1 : 4 = 0.09 bag/m²
1 mÂŗ sand = 35.3 cft
âĒī¸ Brick Masonry (āĻāĻ āĻāĻžāĻāĻĨā§āύāĻŋ)
āĻŽāύ⧠āĻāϰāĻŋ ā§§ āĻāύāĻŽāĻŋāĻāĻžāϰ (1 mÂŗ)-āĻ āĻāϤāĻāĻŋ āĻāĻ āϞāĻžāĻā§ āĻŽāϰā§āĻāĻžāϰ āϰā§āĻļāĻŋāĻ āϏāĻŋāĻŽā§āύā§āĻ āĻŦāĻžāϞāĻŋāĨ¤
125 mm (5") āĻĻā§ā§āĻžāϞ āĻĒā§āϰāĻžāϝāĻŧ 480 āĻāĻŋ āĻāĻ 1 : 4 0.30 āĻŦā§āĻ â 14 āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻ 0.12 mÂŗ āĻŦāĻžāϞāĻŋ â 4.5 cft
250 mm (10") āĻĻā§ā§āĻžāϞ āĻĒā§āϰāĻžāϝāĻŧ 500 āĻāĻŋ āĻāĻ 1 : 6 0.25 āĻŦā§āĻ â 13 āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻ 0.12 mÂŗ āĻŦāĻžāϞāĻŋ â 4.5 cft
đ¸ 1 mÂŗ brick masonry-āϤ⧠āĻāĻĄāĻŧā§ 500 āĻāĻ, 0.30 bag cement, 0.12 mÂŗ sand āϞāĻžāĻā§ (ratio 1:4)
đ¸ 1 cft brickwork â 14.1 āĻāĻ + 0.010 bag cement + 0.045 cft sand
âĒī¸ Concrete (RCC / PCC Work)
Mix Ratio āĻĒā§āϰāϤāĻŋ mÂŗ āĻāĻāĻā§āϰāĻŋāĻā§ āϏāĻŋāĻŽā§āύā§āĻ āĻŦāĻžāϞāĻŋ āĻĒāĻžāĻĨāϰ (Aggregate)
1 : 2 : 4 7.3 āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻ 0.44 mÂŗ 0.88 mÂŗ
1 : 1.5 : 3 (M20) 8.22 āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻ 0.40 mÂŗ 0.80 mÂŗ
1 : 3 : 6 5.0 āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻ 0.45 mÂŗ 0.90 mÂŗ
đ¸ 1 āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻ = 0.035 mÂŗ
đ¸ 1 mÂŗ RCC-āϤ⧠āĻĒā§āϰāĻžāϝāĻŧ 80 āĻā§āĻāĻŋ steel (1%) āϞāĻžāĻā§
âĒī¸ Plaster Work (āĻĒā§āϞāĻžāϏā§āĻāĻžāϰ)
āĻĒā§āϰā§āϤā§āĻŦ āϰā§āĻļāĻŋāĻ āĻĒā§āϰāϤāĻŋ m²-āĻ āϏāĻŋāĻŽā§āύā§āĻ āĻŦāĻžāϞāĻŋ
12 āĻŽāĻŋāĻŽāĻŋ 1 : 4 0.09 āĻŦā§āĻ 0.036 mÂŗ (â 1.3 cft)
16 āĻŽāĻŋāĻŽāĻŋ 1 : 4 0.12 āĻŦā§āĻ 0.048 mÂŗ (â 1.7 cft)
đ¸ ā§§ āĻŦā§āĻ āϏāĻŋāĻŽā§āύā§āĻā§ ā§§ā§Ļâ⧧⧍ āĻŽāĻŋ² āĻĒā§āϞāĻžāϏā§āĻāĻžāϰ (12 āĻŽāĻŋāĻŽāĻŋ, 1:4) āĻšā§āĨ¤
âĒī¸ Flooring / PCC Work
āϧāϰāύ Ratio āĻĒā§āϰāϤāĻŋ mÂŗ āĻ āϏāĻŋāĻŽā§āύā§āĻ āĻŦāĻžāϞāĻŋ āĻā§āϝāĻŧāĻž
PCC 1 : 2 : 4 7.3 āĻŦā§āĻ 0.44 mÂŗ 0.88 mÂŗ
PCC 1 : 4 : 8 4.5 āĻŦā§āĻ 0.45 mÂŗ 0.90 mÂŗ
âĒī¸ Reinforcement (Steel) Thumb Rule
āϏāĻĻāϏā§āϝ āϏā§āĻāĻŋāϞā§āϰ āĻāĻĄāĻŧ āĻļāϤāĻžāĻāĻļ āĻĒā§āϰāϤāĻŋ mÂŗ RCC-āϤ⧠kg steel
Slab 1.0 % 80â100 kg
Beam 1.5 % 110â130 kg
Column 2.5 % 200â250 kg
Footing 0.8 % 65â80 kg
âĒī¸ Water Requirement (āĻāϞ)
āĻāĻžāĻ āĻĒā§āϰāϤāĻŋ mÂŗ-āĻ āĻāύā§āĻŽāĻžāύāĻŋāĻ āĻāϞ
PCC 30 āϞāĻŋāĻāĻžāϰ
RCC 35 āϞāĻŋāĻāĻžāϰ
Plaster 20 āϞāĻŋāĻāĻžāϰ
âĒī¸ Paint / Whitewash / Tiles āĻāϤā§āϝāĻžāĻĻāĻŋ (Extra Useful)
āĻāĻžāĻ āĻāύā§āĻŽāĻžāύāĻŋāĻ āĻĒāϰāĻŋāĻŽāĻžāĻŖ
ā§§ āϞāĻŋāĻāĻžāϰ āĻĒā§āĻāύā§āĻ = â 10 m² (2 āĻā§āĻ)
ā§§ m² āĻĢā§āϞā§āϰ āĻāĻžāĻāϞāϏ = â 1.05 āĻāĻžāĻāϞ (5 % wastage)
ā§§ m² āĻĒā§āϞāĻžāϏā§āĻāĻžāϰ⧠â 2.5 āĻā§āĻāĻŋ āĻĒā§āĻāĻŋ āϞāĻžāĻā§
#āĻŦāĻžāĻĄāĻŧāĻŋ_āύāĻŋāϰā§āĻŽāĻžāĻŖā§_āĻāϰāĻ #āĻāĻā§āĻāĻŋāύāĻŋāϝāĻŧāĻžāϰāĻŋāĻ_āĻĒāϰāĻžāĻŽāϰā§āĻļ #āĻā§āϰāĻžāĻŽā§āϰ_āĻŦāĻžāĻĄāĻŧāĻŋāϰ_āĻĒā§āϞāĻžāύ #āĻā§āϰāĻžāĻŽā§āϰ_āĻŦāĻžāĻĄāĻŧāĻŋāϰ_āĻĄāĻŋāĻāĻžāĻāύ #āĻŦāĻžāĻĄāĻŧāĻŋāϰ_āĻĒā§āϞā§āϝāĻžāύ #āĻŦāĻžāĻĄāĻŧāĻŋāϰ_āĻĄā§āϰāϝāĻŧāĻŋāĻ #āĻŦāĻžāĻĄāĻŧāĻŋ_āύāĻŋāϰā§āĻŽāĻžāĻŖā§_āĻŦā§āϝāϝāĻŧ