11/06/2021
Build process of center console of the vette entered in . Started out reshaping tunnel with type one pvc and then covered carpet in Daytona weave carpet. Then using a combo of type one and expanded pvc I created the base and arm rest of console that is heald in with 10/24 hardware. Then using cast acrylic I created the inserts that are all held in with magnets. This creates a removable console for serviceability. One of the most important things in my builds is to think about the builder and the wiring and components they may need to access. Everything has to be removable as well as go back in the same way every time.