05/09/2026
One wrong SKU can kill your federal contract payout. Stop guessing on BAA vs BABA.
BAA (Buy American Act): Applies to direct federal agency purchases. Requires 65% US-sourced components (increasing to 75% in 2029). Don't get caught with 60% for a 65% job.
BABA (Build America, Buy America): Applies to federally funded infrastructure projects (roads, water, electrical grids, etc.). It's stricter, requiring 100% US-manufactured iron and steel. Zero exceptions. On top of that, manufactured products and construction materials must also be US-sourced.
Construction materials include: glass, drywall, fiber optic cable, non-ferrous metals, optical fiber, lumber, drywall, and engineered wood.
Check your contract specs before you order. The wrong part could mean a rejected invoice.