11/25/2025
BWDS LLC is pleased to confirm that our architectural systems, contracted and engineered earlier this year, are now advancing to the installation phase at the new Island School project designed by Atelier PRO / Jacobs Architekten.
To address the region’s distinct climate challenges—including high UV exposure, trade winds, and salt corrosion—the project specifications called for a highly durable solution. The supplied systems utilize the European FT72 platform, which was pre-configured to meet Eurocode wind-load standards and strict ventilation requirements. The package features 32 mm glazing systems with EI30 fire-rated units, specified specifically for island conditions.
While logistics in Bonaire and Aruba present complexity, our operations team and logistics partners are successfully managing the specialized packaging and fulfillment schedules. This project represents another milestone in BWDS’s portfolio of climate-adaptive international construction.
BWDS LLC has begun work on a significant new project in the Caribbean region — the supply and engineering adaptation of aluminum window and door systems for the Island School educational complex. The project, designed by Atelier PRO / Jacobs Architekten (The Netherlands), represents an important m...