09/03/2026
Our exit will be back open Friday morning at 8:00am, we will be open from 9:00-5:00 Friday, and Saturday 9:00-2:00. We will be closed Monday for Labor day. Come out and see us and thank you to all our customers that have not let the exit closure stop them from coming in. Sometimes itโs nice to take the scenic roads. ๐๐
๐.๐. ๐๐ ๐ญ๐จ ๐๐๐จ๐ฉ๐๐ง ๐ญ๐จ ๐๐ซ๐๐๐๐ข๐ ๐
๐ซ๐ข๐๐๐ฒ, ๐๐๐ฉ๐ญ. ๐ ๐๐ฏ๐๐ซ ๐๐ง๐ญ๐๐ซ๐ฌ๐ญ๐๐ญ๐ ๐๐ ๐๐ฑ๐ข๐ญ ๐๐ ๐ข๐ง ๐๐๐๐ซ๐๐๐ค๐๐ง ๐๐จ๐ฎ๐ง๐ญ๐ฒ
๐๐๐ฉ๐๐ฆ๐ข๐ฅ๐ฌ (๐ฆ๐ฒ๐ฝ๐. ๐ฏ, ๐ฎ๐ฌ๐ฎ๐ฒ) โ U.S. 68 will reopen to traffic over Interstate 24 Exit 16 in McCracken County at 8 a.m. Friday, Sept. 4. This includes all four ramps entering and exiting I-24 at this interchange.
What to know about District 1's first roundabout on a state highway:
โช๏ธThe speed limit is 35 mph, with a 25 mph advisory speed in the roundabout. There is a 45-mph transition zone on U.S. 68 in advance.
โช๏ธThe Exit 16 interchange closed on June 22, and construction was completed in about two and a half months โ well ahead of the original four-month estimate.
โช๏ธThe overall project is not yet completed. Paving is scheduled near the intersection of U.S. 68 and KY 284 on Tuesday, Sept. 8, and is expected to last approximately four days. Pavement striping and other finishing work will follow. Anticipate various traffic shifts and expect some delays.
โช๏ธWhen navigating a multi-lane roundabout, motorists should follow pavement arrows directing them into the appropriate lane. Drivers entering the roundabout should yield to vehicles already in the roundabout, which have the right of way.
FULL RELEASE:
https://content.govdelivery.com/accounts/KYTC/bulletins/428425c