05/09/2026
East Main St bridge progress in Ayer. The plans were sent to us by MassDOT, then drawn in AutoCAD to scale, which allows us to easilly shrink it proportionally. We then printed the drawings out, made a cardboard mockup and placed it on the layout to test fit.
Now we look for feedback from the membership, then we’ll start constructing it with styrene.