06/23/2026
Exciting progress continues on our new office building as the project moves closer to completion! Interior finishes are coming together, with countertops and tons of custom millwork now being installed throughout the space. The industrial steel stair systems are taking shape and will serve as striking architectural features connecting the building's levels. Paint is being completed, cloud ceilings are being installed, and tile work is progressing throughout key areas. Carpet installation will soon be underway, along with exterior landscaping to put the finishing touches on the building.
It's rewarding to see so many elements come together as our future home continues to transform from a construction site into a vibrant, collaborative workplace.
Big thanks to all the subs helping bring this project together!
GC: SCS Inc. (Stuhlsatz Construction Syndicate Inc.) (Tim Stuhlsatz)
Electrical: Tejeda Electric
HVAC: Cook's Heating & Cooling Wichita
Plumbing: Brand Plumbing, Inc.
Masonry: Macias Construction
Millwork: JC Carpentry Inc.
Counters: The Countertop Place, Inc
Steelwork: Ten Works Fabrication
Metal Studs, Sheetrock, & Painting: O&J Drywall LLC
Skylights: Crystal Structures
Windows: Mid Continent Glass
Window Shades and Accessories: Czarniecki Construction
Interior Glass Walls/Doors: Alpada LLC
Doors/Hardware: Engineered Door Products, Inc.
Concrete: Brad Murray, Inc.
Concrete Cutting: M6 Concrete Accessories
Polished concrete/Carpet & Tile: Star Lumber & Supply
Acoustic Ceilings: Spexarth Acoustics Inc. & Navy Island
Elevator: CABB Elevator
Roofing: Farha Construction, Inc. Roofing
Sandblasting: Benjamin Mobile Blasting
Fire Protection: Absolute Protection, Inc
Fire Sprinklers: Midwest Fire Protection
Landscape: Tree Top Nursery & Landscape Inc.