The underground phase is very important because if any issues occur, we may have to break up the concrete and excavate again to make repairs. Therefore, we need to carefully inspect all pipe connections to make sure there are no water leaks and verify that the drainage pipes have the proper slope to meet code requirements. This will ensure the drainage system works efficiently and can properly handle the number of pedicure chairs shown in the design.
Project: Noir Nail Bar
Location: Las Vegas